Electrical Engineering Certification Platform

Factory & Site
Acceptance Testing
Digitalised

A complete platform for electrical engineers to create, conduct and certify FAT and SAT acceptance tests — with professional certificates, client management, and full audit trails.

IEC 62381 Aligned
Digital Certificates
Full Audit Trail
Multi-Engineer
FAT
Factory Tests
SAT
Site Tests
100%
Digital Records
ISO
Standards Aligned
Understanding the Tests

FAT vs SAT — What's the Difference?

Both are critical milestones in every electrical project, each serving a distinct and non-negotiable purpose.

FAT

Factory Acceptance Test

Conducted at the Manufacturer's Facility

A FAT is performed at the manufacturer's or system integrator's facility before equipment is shipped to site. It verifies the equipment has been manufactured and assembled in accordance with the project specification and applicable standards — catching faults before installation.

  • Visual inspection — physical condition, labelling, nameplate data verification
  • Electrical tests — insulation resistance, earth continuity, voltage checks
  • Functional tests — sequences, alarms, emergency stops, interlocks
  • Communication I/O — MODBUS, PROFIBUS, digital & analogue signals
  • Documentation review — drawings, calibration certs, O&M manuals
SAT

Site Acceptance Test

Conducted at the Installation Site

A SAT is performed on-site after installation is complete to verify the equipment has been correctly installed, connected to site services, and performs as designed in its final operating environment — before client handover.

  • Site conditions — location, clearances, ventilation, anchoring and levelling
  • Mechanical installation — connections, torquing, pipe and duct integrity
  • Electrical installation — cable routing, terminations, field cable IR testing
  • Commissioning — power-up, load tests, vibration, noise, SCADA integration
  • Handover — as-built redlines, operator training, client sign-off
Platform Capabilities

Everything You Need

Built specifically for electrical engineers who need a reliable, professional certification workflow.

Digital Certificates
Generate professional, print-ready FAT and SAT certificates with all test results, equipment data, and signature fields.
Customisable Questions
Industry-standard question templates loaded automatically. Add your own custom items per test type with mandatory/optional control.
Client Management
Manage all clients in one place. Assign tests per company, track certificate history, and maintain full contact records.
Admin Oversight
Administrators see all engineers, clients and certificates system-wide. Approve completed tests and manage question banks.
Live Progress Tracking
Real-time PASS/FAIL counters as you test. Visual progress bars, colour-coded rows, and instant overall result calculation.
Full Audit Trail
Every action is logged — logins, certificate creation, completions, approvals. Complete traceability for compliance and records.
How It Works

Four Steps to Certification

From first client to signed certificate in minutes, not hours.

1
Add Client
Register the client company and assign contact details to your account.
2
Create Certificate
Choose FAT or SAT, enter equipment details — the test form auto-populates.
3
Conduct Test
Record PASS / FAIL / N/A for each item with measured values and notes.
4
Sign & Export
Complete sign-off, print the certificate, and submit for admin approval.
FS

Ready to Streamline Your Testing?

Log in with your engineer credentials to start creating FAT and SAT certificates. Contact your system administrator if you need an account set up.

Sign In to CertPortal